Luxury Style Golden Plant New Design Steel Flower Stand for Wedding Party

Customization: Available
Application Space: Living Room
Style: European Style

Product Description

Basic Information
Model NO.
F009
Material
Metal / Stainless Steel
Service
OEM and Customization
Frame
Stainless Steel
Top
Marble or Glass
Steel Color
Golden, Champagne, Rose Golden, Brown
Marble
20mm or 40mm Artificial Marble
Glass Color
Black, Different Pattern, Frosted
Shipping Way
By Sea
Delivery
On Time
Quality
High
Capacity
1000PCS/Month
HS Code
9401790000
Specification
dia38*66 / 38*82 / 38*92 / 38*106
Product Description
Luxury Style Golden Plant New Design Steel Flower Stand For Wedding Party
Steel Flower Stand Detail
Product Name Luxury Style Golden Plant New Design Steel Flower Stand For Wedding Party
Item No F009
Material Stainless steel frame, marble or 12mm tempered glass
Packing 5ctns/set; Standard Export Carton Packing
MOQ 5pcs for each model
Delivery Time Trial order: 10-15 days; Formal order: 15-20 days
Payment Terms T/T or L/C, 30% deposit before production, balance before delivery
Flower Stand View 1
Flower Stand View 2
Flower Stand View 3
Flower Stand View 4
Flower Stand View 5
Flower Stand View 6
Frequently Asked Questions
How can I obtain your product catalogue and price list?
Please contact us through the website with your email address. You can also specify which items you are interested in and your preferred price terms (EXW or FOB).
How is the shipping cost determined?
Shipping costs depend on the destination port, weight, packing size, and total CBM of the goods. We provide exact quotes once the order quantity and destination port are confirmed.
What is the process for placing an order?
Select your desired items and colors, then notify us of the quantities. We will issue a Proforma Invoice for the deposit to initiate the order.
Are other currencies accepted besides USD?
Yes, we can accept payments in EUR or RMB. You may also choose to pay the deposit in RMB and the balance in USD.
What is your protocol for quality issues upon delivery?
If any quality issues are found during unpacking, please take photos immediately. Our QC department will evaluate and provide solutions, such as replacing parts or fittings.
What is the lead time for standard and trial orders?
Trial orders typically have a lead time of 10-15 days, while formal orders generally take 15-20 days depending on the volume.

Related Products